MigrateLab
Get yours

Free site measure

Steel railings from $185 a foot, installed.

Porch, stair, deck and balcony railings, built in our Brookhaven shop and hung by our own two-person crews. Price yours in the calculator, then pick a day and we come and measure for free.

  • Free site measure45 minutes, laser measured
  • Installed in 3 to 5 weeksFrom the day you sign
  • 10 year finish warrantyNo peeling, no rust bleed
A two storey home with new porch and balcony railings

Price per foot, installed

Stairs 1.4x. Powder coat included.

Three questions, then a number with install already in it

These are the same per-foot rates we quote from at the kitchen table. No email wall, no salesperson calling back to ask what you meant.

1Pick a style

2Measure roughly

Pace it out or use a tape. Close is fine: we laser measure every job before we cut steel.

Porch, deck or balcony edge

ft

Along the slope, each side

ft
3Choose a finish

Your estimate, installed

$4,650 to $5,550

Picket railing, 24 feet in total.

16 ft straight at $185
$2,960
8 ft of stairs at $185 x 1.4
$2,072
Powder coat
Included
Delivery, install and cleanup
Included

The range covers post count, corners and how your steps are built. We confirm one fixed price at the measure, in writing, before you pay anything.

What $185 to $290 a foot gets you

Every style is 1.5 inch square posts, a solid cap rail and steel we cut ourselves. The price climbs with the time each one spends on the bench, not with the name.

  • Picket

    $185 a foot, installed

    Our most ordered railing. 3/4 inch square pickets under a 1.5 inch cap rail, spaced so a 4 inch ball cannot pass, which is what the code inspector checks.

    Price a picket railing
  • Horizontal bar

    $210 a foot, installed

    Five 1/2 by 1.5 inch flat bars between posts every 5 feet. Suits modern and ranch homes, and reads lighter than pickets from the street.

    Price a horizontal bar railing
  • Cable

    $240 a foot, installed

    Eleven 1/8 inch stainless cables tensioned between steel posts, with a flat top rail you can set a coffee on. Best on decks and balconies with something to look at.

    Price a cable railing
  • Scroll

    $290 a foot, installed

    Pickets with a band of forged scrolls every third bay. Bent on our jig, so every scroll on your railing matches. For older homes and brick front steps.

    Price a scroll railing

A wooden rail that wobbled, replaced by 22 feet of picket

A job on Sumner Street last spring. The wooden steps and rail were past saving, so the owner had a mason pour new ones. We cored four posts into them and ran picket up both sides.

of picket, 18 on the stairs
22 ftof picket, 18 on the stairs
written price, installed
$5,400written price, installed
from measure to install
26 daysfrom measure to install
on site, old rail hauled away
6 hourson site, old rail hauled away
Before: tired white wooden steps and a sagging wooden rail
Before
After: brick steps with a new black picket stair railing
After

Four places a railing goes, and the rule each one has to meet

Every railing we draw leaves no gap a 4 inch ball can pass through. The rest depends on where it stands.

  • A steel stair with black picket balusters

    Stairs

    Handrail 34 to 38 inches above the nose of each step, round or 2 inch flat so a hand can close around it.

    Stair feet are priced at 1.4 times, because every picket is cut to the angle and every post is cored into concrete.

  • A covered back porch with dark picket railings

    Porches and decks

    A guard 36 inches high wherever the floor is more than 30 inches above the ground.

    On wood decks we bolt through the rim joist with blocking behind it, not lag screws into the face board.

  • A balcony with a white picket railing

    Balconies

    Most towns here ask for 42 inches on a second floor. We check yours before we draw anything.

    Side-mounted posts keep the deck surface clear and leave no holes for water to sit in.

  • A scroll railing with forged curls and rosettes

    Older homes

    Brick and stone steps get core-drilled posts set in hydraulic cement, the way the originals were.

    Scroll railings are bent on our own jig in Brookhaven, so a replacement bay matches the rest.

Measured this week, railing up in 3 to 5

Ray Delaney opened the shop in 2011 with one welder and a borrowed trailer. Two crews and about 2,300 railings later, the order of things has not changed.

An installer welding a railing panel outdoors
  1. 1

    Price it here

    Tonight, on your couch

    Pick a style, pace out the feet and get a range with install in it. Then pick a day for the measure.

  2. 2

    Free site measure

    Within the week

    Bryony or Luis laser-measures every run, checks your town’s code and hands you one fixed price in writing. No deposit until you say yes.

  3. 3

    Built in our shop

    2 to 4 weeks

    Cut, welded and ground on Kiln Road, then powder coated at 400°F. Galvanized jobs go to the dip tank first and add about four days.

  4. 4

    Installed in a day

    Most jobs, one visit

    Two installers, posts cored or bolted, touch-up done on site and the old railing hauled away. You pay the balance when it is in and you are happy.

  5. Step one takes about two minutes, and it is further up this page.

    Price my railing

Ten years on the finish, in writing, and it moves with the house

Every railing is sandblasted, primed with zinc-rich powder and top coated in our booth. If it peels, blisters or bleeds rust in ten years, we take the section back, strip it and recoat it free.

  • Powder coat includedTwo coats baked at 400°F. Right for front steps, porches and most decks.
  • Galvanized plus powder coat +15%Hot-dip zinc first, then powder. We recommend it within a mile of the bay, around pools, and wherever posts go into soil.

Four stock colors

Any other RAL color for $150 per job.

  • Textured black
  • Oil-rubbed bronze
  • Slate gray
  • Gloss white

Samples come to the measure. Hold a painted picket against your siding before you choose.

Mostly, people write to us about their parents on the stairs

4.9

312 reviews (sample)

  • “My dad is 84 and had stopped using the front door because the wooden rail wobbled. He goes out for the paper again. The measure took forty minutes and the price did not move.”

    Carla D. (sample review)

    Picket, 4 ft porch and 18 ft stairs

  • “The calculator said $6,850 to $8,200 for our cable deck rail. The written price was $7,480. Installed on a Tuesday, gone by 3pm, not a scratch on the deck boards.”

    Ben and Wynne S. (sample review)

    Cable, 31 ft deck

  • “We are four blocks from the bay, so they talked us into galvanized under the black. Two winters in and the posts at the bottom of the steps look like the day they went in.”

    Marty H. (sample review)

    Horizontal bar, galvanized, 12 ft stairs

Code, permits, deposits and winter installs

Or ask the shop directly on (555) 014-7245. Ray picks up between welds.

How close is the calculator to the final price?

Most written prices land inside the range. What moves it: how many corners and posts the run needs, whether your steps are concrete, brick or wood, and whether an old railing has to be cut out of concrete. The written price after the measure is fixed, and it is the price on your invoice.

Do I need a permit, and will my railing pass inspection?

Replacing a railing on existing steps usually needs no permit in the Tri-County towns. New decks and balconies do, and we pull the railing permit for you at cost. Every railing we draw passes the 4 inch sphere rule and the height rules above, and we are there for the inspection if your town wants one.

How much do I pay up front?

Nothing for the measure. 40% when you sign, so we can order steel and book the powder coat line, and 60% after install once you have walked it. Card, check or bank transfer.

Can you install in winter?

Yes, down to about 20°F. The finish is baked on in the shop, so cold does not affect it. Posts set in concrete use a cold-weather hydraulic cement. Snow days just move your install by a day or two.

What does the 10 year finish warranty cover?

Peeling, blistering, chalking and rust coming through the powder coat, anywhere on the railing, for ten years from install. If it happens, we take the section back to the shop, strip it, recoat it and reinstall it at no charge. It moves with the house if you sell.

We measure for free. You decide after.

Leave your number and street and we text you two measure times for this week. Rather talk it through? Call the shop.

  • Shop at 40 Kiln Road, Brookhaven
  • We install within 35 miles of the shop
Call (555) 014-7245

Text me measure times

RailRight Iron RailingsRailRightIRON RAILINGS

Steel railings and gates for Tri-County homes, built on Kiln Road in Brookhaven since 2011.

(555) 014-7245

The shop

40 Kiln Road
Brookhaven

Mon to Sat, 7am to 5pm

Contractor Lic. #000000 (sample). Reviews and ratings are samples.

RailRight is a concept brand created by MigrateLab for illustration.