MigrateLab
Get yours

Architects send us the drawings. We send back the lighting plan.

Wirewright wires new builds and deep renovations across the Aveline valley, from the second design meeting to the evening we sit in the finished house and set the scenes with you.

Projects from $24,000. Lighting design $2,400, credited in full when we do the install.

A high-ceilinged room at dusk with wall lights, table lamps and a lit ceiling wash
Wrenfold House at half past eight in October. Four layers, one plate by the door.
Licence
Lic. #000000 (sample)
Insurance
$2M public liability
Working since
2009, from Cottersley
Houses wired from drawings
61
Typical new build
9 to 14 weeks on site
Emrys Tasker, who owns Wirewright, at the drawing table window
Emrys Tasker, at the window he marks up drawings in.

Emrys Tasker spent four years arriving last.

I trained on sites where the electrician came through the door after everybody else and got blamed before anybody else. The ceilings were drawn, the joinery was made, and every good idea cost somebody money to undo.

In 2009 I started Wirewright with one rule that has not moved since. We come to the second design meeting, or we do not come at all. Seventeen years on we run two teams and take about nine houses a year, which is fewer than we could and about right for the way we work.

I still mark up every lighting plan myself, in pencil, usually on the kitchen table of whatever house we happen to be in. Then it gets drawn properly and issued the same week.

Emrys Tasker, Cottersley

Four ways a project reaches us, and one that does not.

Everything below starts with a survey or a drawing. Nothing below starts with a price over the phone.

  1. New builds, from the slab

    We set out on the slab with the reflected ceiling plan in hand, first fix before the plasterer is booked, and come back for second fix after the decorator. One supervisor the whole way through.

    From $24,000. Nine to fourteen weeks on site.

  2. Deep renovations

    Houses where the plaster is coming off anyway. We chase only what has to be chased, run the rest in the floor void, and hand back a house that looks as though nothing happened to it.

    From $24,000. Survey first, always.

  3. Lighting design on its own

    Reflected ceiling plan at 1:50, circuit schedule, switching diagram and a fittings schedule with a budget for every room. Yours to build with any electrician you like.

    $2,400, credited in full if we do the install.

  4. Second fix on somebody else’s first fix

    The awkward one. We survey what is already in the walls, tell you plainly what can be saved and what cannot, and finish the job properly from there.

    Priced after the survey, never before.

We do not do callouts. No fault finding at nine at night, no fuse changed on a Sunday, no consumer unit swapped in an afternoon. Two firms in Cottersley do that work very well and we will give you their numbers rather than pretend.

Pick a room. This is what we put in it.

Every room we light gets four layers: ambient, task, accent and night. What changes room to room is the fittings, where the plates go and what it costs. Budgets here are fittings only, at the specification we would put on a drawing.

A kitchen at dusk with pendants over the island and light under the wall units
Wrenfold House, 2025. Nine fittings, three circuits.

Kitchen

The room that gets over-lit more often than any other. We take the downlights out of the middle of the ceiling and put them where somebody is actually holding a knife.

  1. Ambient

    Six 2700K downlights on the perimeter

    Aimed at the wall units rather than the floor, so the light comes back off the cabinet fronts and nobody chops in their own shadow.

  2. Task

    Linear LED under every wall unit, three pendants over the island

    Pendants hung 30 inches above the stone and 30 inches apart, on one dimmer so they always come up together.

  3. Accent

    Warm strip inside the glazed dresser and over the pelmet

    On its own circuit, because this is the layer people leave running when the kitchen is closed for the night.

  4. Night

    One 3W light under the island toe kick

    Set to 2 percent after 11pm. Enough to find a glass, not enough to wake the house.

Where the switches go

  • Two-gang plate inside the door at 1,100mm

    Above the worktop line, so a bag of shopping on the counter never sits in front of it.

  • A second plate at the pantry end

    Nobody should cross a dark kitchen to turn the kitchen on.

  • Nothing on the island

    Islands get wiped down twice a day. A switch there is a call-back we would rather not design in.

Fittings budget for this room
$4,200 to $6,800
What we run behind it
3 lighting circuits, 2 dimmer modules, 14 outlets

What a practice gets from us, stage by stage.

Three quarters of our work arrives from eleven practices in the valley. This is what they are actually buying.

A lighting plan marked up on a site table

Ground floor at 1:50, marked up on the table at Tibbwell.

  1. The second design meeting

    We sit in, usually before the ceilings are drawn. An hour there saves a week of chasing later, and it is where most of a lighting plan is actually decided. No charge and no obligation on either side.

  2. The lighting plan

    Reflected ceiling plan at 1:50, circuit schedule, switching diagram, fittings schedule with a budget per room, and an emitter list your client can price anywhere they like. Issued as PDF and DWG, usually three weeks from the meeting.

  3. Coordination with the other packages

    We mark up the plasterer’s setting out, the joiner’s shop drawings and the kitchen elevations, because half of a lighting plan lives inside somebody else’s drawings and gets lost there.

  4. On site, and six months after

    One supervisor from setting out to handover. We commission in the evening with the lights off, and we come back once, at no charge, six months later to reset whatever the household has learned it wants differently.

Nine to fourteen weeks, and the four of them you will not see us.

A new build of about 4,000 square feet, start to handover. Renovations run shorter on site and longer on the calendar, because the house has opinions.

  1. Week 0

    Setting out

    Chalk on the slab with the architect and the builder. Two hours that decide everything after them.

  2. Weeks 1 to 4

    First fix

    Cable, back boxes, containment, and the slots for the stair lights cut before the boards go on. Every run is photographed and filed before it is covered.

  3. Weeks 5 to 8

    Plaster and dry-out

    We are not on site. Nobody warns clients about this gap, and it is why a nine week job reads as fourteen on a calendar.

  4. Weeks 9 to 12

    Second fix

    Fittings, plates and terminations. Plates go on after the decorator, which is why ours are not painted over.

  5. Week 13

    Commissioning

    An evening with the lights off. We set the four scenes in every room with whoever is going to live there.

  6. Week 14

    Certification and handover

    Testing, certificates, the folder, and a walk round with the builder before we take the van off the drive.

The folder that arrives at handover.

Six things, in a box file with the house name on the spine. It is what a surveyor asks for when the house is sold in fifteen years, and it is the reason we photograph every run before it is covered.

  • Electrical installation certificate, signed by the supervisor who tested the job
  • Schedule of test results, circuit by circuit
  • As-installed drawings, with every first fix run photographed behind them
  • Fittings schedule with model numbers, colour temperatures and suppliers
  • The scene settings written down, so they can be restored after a power cut
  • Two spares of every lamp and every plate, in a labelled box

Lic. #000000 (sample). $2M public liability. Every certificate is issued in the name of the supervisor who tested the job, not in the name of the company.

A wall light on a plaster wall, hung at the height the drawing called for
Fixing height 1,680mm, set on the drawing and checked against the door head before the plate went on.

Six towns, and what the drive to each one costs you.

No travel charge inside 25 miles of Cottersley. Past that it is $0.68 a mile, written on the quote rather than added at the end.

  • Cottersley

    The yard

    31 of our 61 houses are inside this one town

  • Winnow Bridge

    12 minutes

    Victorian renovations off the mill road, mostly

  • Halbert Green

    18 minutes

    New builds on the south side, four in two years

  • Prye Hill

    24 minutes

    Listed houses. More often design only than install

  • Tibbwell

    31 minutes

    Barns. Long runs and no ceiling voids to hide them in

  • Aveline St Mary

    38 minutes

    Our limit for a daily team. Past it we stay over

Four houses, what they cost and what changed halfway through.

Budgets are the electrical package only, fittings included, as invoiced. Sample projects for this concept site.

Wrenfold House

Project
New build, 4,100 sq ft
Electrical package
$86,400
On site
13 weeks
Finished
2025

The owner saw the framing projector at Aveline Row and added six more at second fix. It came to $4,900 and four days, priced before we started rather than argued about after.

The Long Barn at Tibbwell

Project
Barn conversion
Electrical package
$61,500
On site
14 weeks
Finished
2024

No ceiling voids anywhere in the building. Every run went in the floor or in a service zone we agreed with the engineer in week one. We lost a week and the roof structure stayed exactly as it was.

No. 6 Aveline Row

Project
Georgian, deep renovation
Electrical package
$44,200
On site
11 weeks
Finished
2025

Original cornices on both floors. We ran the whole first fix from the floor above and did not chase a single ceiling, which added about $3,100 and saved plasterwork nobody could have replaced.

Prye Hill Rectory

Project
Lighting design only
Electrical package
$2,400
On site
Drawings in 3 weeks
Finished
2026

Their own electrician built it straight from our drawings. We came back for a day to commission it, and the stair is one of the best things we have been part of.

What the practices say, in their own words.

  • They came to the second design meeting with a printed reflected ceiling plan for a house that did not have ceilings yet. I have not drawn a lighting layout myself since.

    Iona Bracken, Bracken Architects

    Sample note, written for this concept site

  • The plates went on after my decorator. In nineteen years of specifying interiors that had never once happened to me.

    Sylvie Ottery, interior designer

    Sample note, written for this concept site

  • Wirewright came in about twelve percent above the next quote. The variations came to nothing at all, so they finished as the cheapest of the three.

    Aurelie Hensley, Sarsen & Hensley

    Sample note, written for this concept site

Six things practices ask before the first meeting.

Do you take work without an architect?

About a quarter of it, yes. We ask for measured plans, and if there are none we will draw the ground floor ourselves for $600 before we quote anything, because a quote off a sketch helps nobody.

Is the $2,400 design fee really credited back?

In full, against the first invoice, as long as first fix starts within twelve months of the drawings being issued. If you take the drawings to another electrician it stays a design fee, and the drawings are yours either way.

What is the smallest project you take?

$24,000 of electrical work, or a lighting design on its own at $2,400. Below that we are the wrong firm, and we will tell you so on the phone in about two minutes rather than send a quote you will not like.

How far ahead are you booked?

First fix slots usually sit eleven to sixteen weeks out. Design work starts sooner, often inside three weeks, which is one good reason to begin there.

Who actually turns up?

One supervisor stays with the job from setting out to handover. Emrys takes the new builds, Oskar Tolme takes the renovations, and you will have both mobile numbers from the first week.

Can we use our own fittings?

Gladly, and we would rather you did than settle for ours. We check the driver, the dimming protocol and the cut-out before anything is bought. It takes an hour and it has saved clients a great deal more than that.

Book a lighting design meeting.

An hour, at the practice or at the house, with the plans on the table. We bring a fittings box and a dimmer so you can see the difference between 2700K and 3000K on your own wall before anybody commits to anything.

The drawing office
4 Lammas Yard, Cottersley
the Aveline valley
When we answer
7am to 6pm, Monday to Friday. Design meetings most Tuesday and Thursday afternoons.

Rooms you were reading about

Nothing yet. Pick a room further up the page and it will land here, so we arrive at the meeting knowing what you have already looked at.

We reply within one working day and send a date, not a brochure.