MigrateLab
Get yours
A suspended cradle part way up a city block, with sheeted scaffold on the building next door

Exteriors at height, on buildings that never close.

Apartment blocks, warehouses, schools and one church spire, painted by nine people who spend April to October outdoors in Kemberley. Everything above three metres is reached on a tower, a lift, a scaffold or a rope, and priced that way on the quote.

Season runs 1 April to 20 October. Three weeks of coating weather left in 2026, and the 2027 book is open from the first week of January.

17 seasons

Painting outdoors here since 2009

Crew of nine

Ours. No agency labour on a wall

IPAF and IRATA

3a and 3b on lifts, level 3 on ropes

$10m

Public liability, certificate with every quote

Lic. #000000

Sample number for this concept

Six kinds of building, all of them taller than a ladder

We do not paint houses. Everything here is a building somebody is responsible for: a board, a bursar, a facilities manager or a warden, all of whom have to explain the invoice to somebody else.

  • Apartment blocks

    Render, balconies, stair cores and up to eighty front doors, priced one elevation at a time so the board can stage it over two seasons.

    From $48,000

  • Warehouses and units

    Profiled cladding, roller shutters and gantries, airless sprayed at weekends when the loading bay cannot stop for us.

    $19 per m2 sprayed

  • Schools and public buildings

    Priced in February, painted in the six week holiday, keys back two days before the staff come in. The whole crew on one site.

    Surveyed in February

  • Churches, spires and towers

    Louvres, weatherboards, clock faces and finials, reached on ropes so the churchyard below stays open and nothing gets tied into old stone.

    From $18,400

  • Communal stair cores

    The inside half of a block. Corridors, handrails, riser doors and flat entrance doors, done floor by floor with one stair always open.

    From $340 a floor

  • Steel and anti corrosion

    Fire escapes, walkways and plant decks. Wire brushed to St2, zinc phosphate primed and two pack coated, mostly off site in our own booth.

    Winter work

Access, by height

Pick a height. It decides the kit, the crew, the price and the weather.

Paint costs roughly the same at ground level and at thirty metres. Everything else changes. This is the same table we price from, so you can work out most of your own quote before you call us.

0 m4 m9 m18 m38 m

Drawn to scale against the tallest thing we work on, the 38 m spire at Ardenhall.

Five storeys, nine to eighteen metres

How we get there
Tube and fitting scaffold, sheeted, with a goods hoist on the gable
Who is on it
Five painters, plus a scaffold crew of three for two days at each end
Day rate
$2,450 a day, and scaffold at $310 a week per elevation
Weather window
Dry overnight, surface above 8C, and spraying stops above 8 m/s.
Before we start
Scaffold design signed off first. A pavement licence in Glaswell takes ten working days.

A job we did at this height

Glaswell Court, 56 flats

2,400 m2 of render and four stair cores, twenty six working days across June and July.

Render, brick, cladding, steel, and what goes on each

We buy three ranges and no more: one masonry, one two pack metal system, one trade gloss. Every tin is listed on the quote by product code, so you can check what actually went on the wall against what you paid for.

Cement render and pebbledash
Stabilising primer, then two full coats of pliolite masonry
10 to 12 years
Painted brick
Alkali resistant primer, then two coats of breathable masonry
8 to 10 years
Profiled steel cladding
Degrease, mordant wash, two sprayed coats of polyurethane
12 to 15 years
Structural steel and railings
Wire brush to St2, zinc phosphate primer, two pack top coat
15 years
Timber fascia, soffit and boarding
Wet rot cut out, knotting, primer, undercoat and two gloss coats
6 to 8 years
Concrete balcony soffits
Chloride test, patch repair, then an anti carbonation coating
15 to 20 years
uPVC and aluminium frames
Adhesion promoter and a satin acrylic urethane, brushed not sprayed
10 years
A roller laying the first coat on a wall

Two full coats, every time. A single coat over sound render looks identical on the day you sign it off and fails about four years early.

Nobody moves out while we paint

Exterior jobs are lost after the price is agreed, not before. They are lost in week three, when somebody cannot get to their balcony and rings the board. These six things go in the contract.

  1. 1 Two letters, not one

    A letter through every door ten days out, and a second one the night before your own elevation starts. People forget the first one.

  2. 2 Balconies go a stack at a time

    We take one vertical stack of balconies out of use at a time, so nobody loses theirs for more than four days in a twenty six day job.

  3. 3 Nothing noisy before nine

    On site at 7:30 for setting out and masking. No needle guns, grinders or compressors until 9am, and none at all after 4:30pm.

  4. 4 Sheeting off on a Friday

    Ground and first floor sheeting comes off every Friday afternoon and goes back on Monday, so nobody spends a weekend in the dark.

  5. 5 Six bays, coned on a Sunday

    We mark the six parking bays the scaffold and the van need on Sunday evening, and we leave the rest of the car park alone.

  6. 6 One number, answered by the site lead

    Residents get a mobile that reaches Elspeth on site, printed on the notice. Not the office, not a form, not an answerphone.

Two of the crew on scaffolding at second floor level
A scaffold run along a long elevation

Seven towns, and what it costs to get the scaffold there

Scaffold travels badly and permits travel worse. This is where we go, how far it is from the yard, and the thing that decides the start date in each one.

Kemberley
Base
The yard is here. If the scaffold is free we can be on a wall the same week.
Glaswell
6 miles
Three blocks done. A pavement licence takes ten working days, so we apply the day you sign.
Torbeck
11 miles
Mill conversions, and the only town where we have painted the same building twice.
Culverton
14 miles
Two schools, both booked into the summer holiday a year ahead.
Ardenhall
19 miles
The spire, the market hall lantern, and a lot of stone we tell people not to paint.
Spindale
23 miles
The industrial estate. We spray at weekends so the bays keep running.
Dunmoor
28 miles
As far as we go. Past 25 miles the crew stays over and the quote carries $240 a night.

Three jobs, measured in square metres and days

A painter on a boom lift at an apartment block elevation

56 flats, five storeys, 18 m

Glaswell Court

Render last coated in 2003, and 41 m2 of it came off in the wash. We patched, primed and put two coats on 2,400 m2, then did four stair cores while the scaffold was still up. The north gable turned out sound, so it came off the invoice at $4,100 before the final bill.

Render coated
2,400 m2
On site
26 days
Final invoice
$71,400
A rope access technician working down a high wall

38 m spire, no scaffold

St Aubin's, Ardenhall

A scaffold around this spire was quoted at $31,000 on its own. Two technicians worked it on ropes off four anchors we pull tested first, and the churchyard stayed open, including for a funeral on the Wednesday. Louvres, weatherboards, the finial and 70 m of lead edge.

Top of the finial
38 m
Two on ropes
9 days
Final invoice
$23,600
A sprayer in full protective gear coating steelwork

Walkways and gantries, off site

Kemberley Freight, Spindale

Sixty two walkway sections came off the frame in November, went through the booth in our yard over the winter, and went back up in April. The depot lost one weekend of walkway access instead of six weeks of it, and the steel was blasted properly rather than wire brushed in the rain.

Blasted and coated
62 sections
Handrail
340 m
Final invoice
$38,900

Insured to $10m, and nobody paints off a ladder above three metres

  • $10m public liability and $5m employers liability. Both certificates go out with the quote, not after somebody asks for them.
  • Every operator holds IPAF 3a and 3b. Rope work is run by an IRATA level 3, and a level 1 never works a drop on their own.
  • A written rescue plan for every rope job, filed with the building manager before the first drop of the week.
  • Scaffold is handed over with a tag on the ladder gate and inspected in writing every seven days, whether or not we are on it.
  • Nobody paints off a ladder above three metres. It is the one rule here that has never been bent for a deadline.
  • Seventeen seasons, no lost time injury. Sample figure for this concept.
An access supervisor in a harness on the scaffold
Elspeth Sefton runs access. She is IRATA level 3, she signs every rescue plan, and she is the number printed on the residents notice.

April to October, month by month

Exterior painting is a seven month trade in this climate and pretending otherwise is how coatings fail early. Here is what each month of the season is actually good for, and what we do with the other five.

April
The first fortnight is a lie. We start when the surface holds 8C overnight, usually around the 10th, and always on the south and west walls first.
May
The best month of the year for render and brick. Long days, low humidity, and nothing baking off before it has flowed out.
June
Schools are surveyed and priced now. Cladding spraying starts, because the mornings are dry by seven and the wind drops after ten.
July
The whole crew goes on one school and stays there. Six weeks, one site, no split days and no driving between towns.
August
Too hot for dark colours on a south wall after 11am. We start at 7:30 and follow the shade round the building all day.
September
Towers and spires. The sun is off the stone and the wind is under 7 m/s on most days, which is what rope work needs.
October
Last top coat by the 20th. After that the film will not dry before dusk, and you are paying for a coat that will fail early.
November to March
Stair cores, steelwork through the booth in the yard, and next season surveys. We do not paint outside in a Kemberley winter, and we will say so.

From the people who hold the keys

They took the north gable off the invoice because the render turned out sound. I have chaired this board for nine years and nobody has ever handed money back before the final bill.
Nola Ostrander
Chair of the residents board, Glaswell Court. Sample review.
Six weeks, one crew, and the corridors were clear for the cleaners every evening. We had the keys back on the Thursday, two days before the staff came in.
Vincent Aluko
Site manager, Culverton Primary. Sample review.
They worked the two Sundays we asked for and the loading bay never stopped once. The walkways came back in April looking better than the day they went up.
Ingrid Vasquez
Operations, Kemberley Freight. Sample review.

Survey, a price per elevation, then one elevation at a time

  1. 1 A survey from the ground, and from a drone

    Forty minutes on site. We photograph every elevation from the ground, fly the top two thirds, and measure the square metres off the stills. You keep the drone images whether or not you use us.

  2. 2 A price per elevation, with access on its own line

    Within three working days. Prep, paint and labour per elevation, access priced separately, so you can see what the height is costing and drop an elevation if the budget says to.

  3. 3 One elevation at a time, signed off before the scaffold moves

    You walk each elevation with the site lead before we strike. Everything on the snag list is done while the access is still there, because going back up costs more than getting it right.

What a facilities manager asks first

(555) 014-5150
Can you paint a block while people are living in it?

Almost everything we do is occupied. Nobody moves out, nobody loses a week of their balcony, and the only thing residents have to do is take washing in off the line on their own four days. The section above lists exactly what we commit to, and it goes in the contract.

Who pays for the scaffold, and whose contract is it?

It is on our quote at $310 a week per elevation, and it is our contract with the scaffold firm, so you deal with one company. If the job runs long because of us, the extra weeks are ours. If it runs long because the colour changed in week three, they are yours.

What happens when it rains for a week?

Standing scaffold costs the same whatever the sky is doing, so weather days are built into the programme: four in May, seven in September. You are not charged labour for a day we cannot work, and the programme we send you already has those days in it.

Why is your quote twice the one from the man with the ladder?

At 18 metres roughly 40 percent of the price is access, not paint. The cheap quote is usually a ladder, one coat, and no prep on the parts nobody can see from the pavement. Ask both of us for the moisture readings and the number of coats in writing, and the gap explains itself.

How do I know you are not coating damp render?

Every quote carries moisture readings elevation by elevation, taken at four heights with a meter. Above 18 percent we will not coat it. We will tell you what is causing it, usually a failed hopper or a bridged cavity, and what it costs to fix first.

Can you start in February?

Not outside. February in Kemberley will not give us a surface above 8C overnight, and a masonry coat that does not cure properly fails in three years instead of eleven. We will survey and price in February, do your stair cores or steelwork in the meantime, and be on the wall in April.

Book a survey from the ground

Forty minutes on site, nothing to pay, and you keep the drone images either way. We survey within eight working days in season and within three over the winter.

(555) 014-5150

Unit 6, Bellfounder Yard, Kemberley. Quotes go out within three working days of the survey, itemised per elevation.

HIGHSIDEEXTERIOR & COMMERCIAL

Exterior and commercial painting for Kemberley and six towns around it. Nine people, one yard, seventeen seasons.

Where we are

Unit 6, Bellfounder Yard, Kemberley

(555) 014-5150

Surveys all year. Outside work 1 April to 20 October.

Cover

Lic. #000000 (sample)

$10m public liability, $5m employers liability

IPAF 3a and 3b, IRATA level 3 supervision

Prices, projects and reviews are sample values

Highside is a concept brand created by MigrateLab for illustration.

Call Highside (555) 014-5150