MigrateLab
Get yours

The colour is the job. The painting is how it gets on the wall.

Pigment Hall specifies and mixes colour for period interiors across the Orsett valley. Limewash, eggshell on panelling, hand-painted kitchens and water gilding, for eleven interior designers and about forty houses a year.

Booking six to eight weeks ahead. The $450 comes off any job over $6,000, which is most of them.

  • Distemper white
  • Aubergine
  • Sage
  • Terracotta
  • Ink
A drawing room in a deep olive flat finish, with afternoon light raking across the wall

Licence, insurance and how far ahead we are booked

Since 2009

Seventeen years, one valley, four of us

41 listed interiors

Consent applications supported since 2011

$2m cover

Public liability. Lic. #000000 (sample)

6 to 8 weeks

How far ahead we are booking today

Verity Ambrell, who mixes the colours
Verity Ambrell, who mixes every colour that leaves the workshop.

Why the colour costs $450 before a brush comes out.

I trained as a picture restorer and came to decorating sideways, through varnish and pigment rather than up a ladder. That is why the consultation is charged for separately. It is the part that takes the knowledge, and it is the part that stops you paying to have a room done twice.

The painting afterwards is craft, and the four of us are good at it. But a hand-brushed kitchen in the wrong green is still a kitchen in the wrong green, and no amount of cutting in saves it.

Verity Ambrell, Pigment Hall, since 2009

Six finishes, and what each of them costs.

Square metre rates cover walls in sound condition. Preparation is quoted separately and itemised line by line, because preparation is where a cheap quote hides.

  • Limewash

    From $58 a square metre

    Three coats on lime plaster, bare brick or a clay base coat. It has to breathe, so it goes nowhere near a gypsum skim unless we stabilise the wall first and say so in the quote.

  • Dead flat on walls

    From $34 a square metre

    Two percent sheen, three coats, brushed out rather than rolled. There is no angle you can stand at where a dead flat wall shines back at you, which is the entire point of it.

  • Eggshell on panelling

    From $46 a square metre

    Hand-brushed, two coats over a bonding primer, cut back with 320 grit between them. No spray, and no roller stipple left sitting in the fielding of a panel.

  • Hand-painted kitchens

    From $5,400

    A twelve-door kitchen, nine working days, four coats on every face including the backs of the doors. Doors come off and go on trestles, in your garage or ours.

  • Water gilding and gold leaf

    From $180 a linear metre

    23.5 carat loose leaf on cornice, picture rail and overmantel frames, laid on red bole and burnished with an agate. Oil gilding instead where the room is damp.

  • Dragging, stippling, scumble

    From $390 a door

    Dragged in oil glaze over an eggshell ground, the way a Victorian grainer did it, then two coats of flatting varnish on anything that gets a hand on it daily.

Everything above is priced with our own materials. If a designer specifies a paint we do not hold, we buy it at cost and add nothing to it.

Tell us which way the room faces and we will tell you what goes in it.

This is the first twenty minutes of a consultation, done on your phone. Every colour below is one we mix ourselves, and the note under each one is what Verity would say standing in the room with you.

Hand-painted colour cards laid out on the consultation table
The room
Which way the window faces
When the house was built

Victorian, 1840 to 1900

Sixteen wall colours sit behind this panel, one for each period and aspect. All of them are mixed by hand on Quillon Street, two litres at a time.

Drawing room, north light, victorian

Walls

Quillon Aubergine PH 21

Ground to match the parlour scheme at 9 Quillon Street. North light holds the violet steady, so a colour this dark reads rich rather than muddy, even at dusk.

Woodwork

Parchment PH 22

A yellowed off-white, so the woodwork does not cut the wall in half the way a modern brilliant white does. In north light it stays flat and even all day, which is the whole job of an off-white.

One accent, used small

Bishop Violet PH 26

Deep violet on the back wall of a bookcase, where it is only ever seen in half light behind objects. North light holds violet honestly, without the pink that ruins it in a sunnier room.

The finish we would specify

Walls
Dead flat, three coats, laid off with a brush rather than rolled
Woodwork
Eggshell, hand-brushed, two coats over a bonding primer

A drawing room is looked at from a chair, from six feet, for hours at a time. Dead flat holds no sheen at all, so the colour is the only thing in the room doing any work.

Victorian plaster is usually sound but rarely flat. We fill and rub the whole wall before the first coat, which is two days you will never see afterwards.

What we would not put in this room: a cold grey, or any white with blue in it. North light is already supplying the cold.

Book the colour consultation, $450

We paint these at A2 in the real finish and leave them on your wall for a week before anyone commits.

Cutting in by hand along the edge of a panel

On a listed interior nothing is masked and nothing is sprayed. Every edge in the room is cut in by hand, which is slower and is the reason it is allowed at all.

What we hand to a conservation officer.

Listed building consent covers decoration more often than people expect, and an application that arrives with the paint questions already answered goes through in weeks rather than months. This is the pack we send with it.

  • A paint scrape, sectioned and photographed

    We cut back through the layers somewhere nobody looks, usually behind a shutter, and photograph the section at forty times. On a Georgian house that is often eight schemes deep, and the third one down is frequently the good one.

  • A breathability statement for every coat

    Product data and vapour resistance figures for each coat in the build-up, handed over as one document. Nobody has to take our word for what is going on the wall.

  • Sample panels, left up for fourteen days

    A2 boards in the real finish, fixed to the wall rather than propped against it, and looked at in February light as well as in June. Two weeks is long enough to stop most mistakes.

  • Consent support on 41 interiors since 2011

    We write the decoration section of the application and answer the conservation officer directly. There is no charge for it if we are the ones doing the work.

  • And the things we will not do

    No vinyl emulsion, no acrylic eggshell and no silicone on a wall built before 1919. If a specification asks for them we put our objection in writing before the first day on site.

Eleven studios hold an account here. Four of them send most of the work.

Trade terms are 15 percent. Quotes come back inside four working days in your own schedule format, and you get Wilfred Marchant’s mobile number rather than an office line.

  • Maundrell & Co

    Cawley Bridge

    Kitchens and fitted joinery. Nine kitchens together since 2019, and they have stopped asking for a sample door.

  • Studio Cardew

    Selborne

    Whole-house schemes. They send a palette, we mix to it, and their clients never see a paint chart.

  • Lanyon Interiors

    Ormesby

    Gilding, dragged doors, and anything with a glaze in it that the trade has largely forgotten how to do.

  • Rowsell & Tressider

    Netherby

    Listed buildings, and all the paperwork that arrives with them.

Six towns, forty miles, and the workshop in the middle of them.

Forty miles from Quillon Street costs you nothing extra. Past that we quote accommodation for the crew, because four hours of driving a day comes out of your wall time.

Cawley Bridge
The workshop
Where every colour is mixed. Half our kitchens are within two miles of the door.
Thurlow
9 miles
The Victorian terraces off the market square. Mostly hall, stair and landing schemes.
Selborne
14 miles
Farmhouses, lime plaster and a great deal of limewash.
Ormesby
21 miles
Edwardian villas on the hill, and two of the four studios we work for.
Netherby
28 miles
Listed work. Three of the four consents we supported last year were here.
Calverley
36 miles
Sixties and seventies houses, where the original joinery is usually worth saving.

Four rooms, what they were, and what they cost.

Prices are what these clients paid, materials and preparation included. Sample projects, shown for illustration.

A hand-painted kitchen, the island in a deeper tone than the runs

A kitchen in Thurlow

What it was
Factory-sprayed grey, six years old, and already chipped along every door edge.
What we did
Doors off, lacquer keyed by hand, four brushed coats of eggshell. The island went two tones deeper than the runs so the room had a middle.

$6,900Eleven days on site

The drawing room at Trescott House

What it was
A 1970s scheme in magnolia, with the overmantel frame painted over in the same paint as the wall.
What we did
Five days of water gilding on the frame alone, 23.5 carat on red bole. Walls in PH 04 Rectory Drab, dead flat, three coats.

$14,200Four weeks

A gilded overmantel in a period drawing room, the walls in a pale stone colour
A stair hall in a strong yellow, with the joinery carried a shade deeper

The stair hall at Sibthorpe Rectory, Grade II

What it was
Eight schemes deep. Under all of them, a strong yellow from about 1815 that nobody had seen in two hundred years.
What we did
The officer agreed we could put it back. Dead flat above the rail, eggshell below it, and the handrail waxed rather than painted.

$9,600Three weeks

A bedroom on Quillon Street

What it was
A new lime skim, laid in October, still green when we first saw it.
What we did
Three coats of limewash brushed on in opposing directions so the texture reads at a low angle. Four of the six days were spent waiting for it.

$3,850Six days

A bedroom in limewash, the texture showing in low evening light

4.9 from 88 reviews. Three of them.

  • We have had four decorators through this house. Verity is the only one who asked which way the room faced before she asked what colour we liked.

    Nerys Gadsby

    Selborne

  • They quote in our own schedule format, it comes back in four days, and Wilfred answers his phone on a Saturday. That is most of the reason they get our work.

    Alaric Maundrell

    Maundrell & Co

  • The sample boards stayed on our wall for nine days and we changed our minds twice in that time. Nobody sighed.

    Edmund Braithwaite

    Calverley

Sample reviews, written for this concept site.

Three appointments between the phone call and the first coat.

  1. The visit. Two hours, $450.

    We come at the hour that matters for the room, which for a west-facing drawing room means four in the afternoon and not ten in the morning. We record the aspect, the plaster, the floor, the furniture that is staying, and we photograph all of it.

  2. The scheme. Eight working days.

    Colours named, mixed, and painted onto A2 boards in the finish they will actually be in. The boards are fixed to your wall and left there for a week. You get a written schedule with the finish, the colour and the number of coats for every surface in the house.

  3. The quote, and a date.

    A priced schedule, room by room. The $450 comes off any job over $6,000, so on most houses the consultation costs nothing in the end. We are booking six to eight weeks out.

Asked at the first visit.

Can I take your scheme to my own decorator?

Yes. The consultation is $450 and the specification pack is another $180. It names every colour, the finish for every surface, the primer and the number of coats. We have no interest in holding it hostage, and about one in six clients does exactly this.

Can you match a colour that is already on the wall?

Usually. We take a scrape, cut it back to the layer you want, and mix against it in north light at the workshop. Two days, $60, and you leave with a litre of it.

What happens if it is wrong once it is on the wall?

If you followed the boards and the colour we specified is genuinely wrong in the room, we repaint that room in a new colour at our own cost, once. It has happened three times since 2009 and we would rather tell you that than pretend it never does.

Will limewash come off on a sleeve?

For about a fortnight, slightly, on the darker colours. After that it has carbonated and it does not. In a hall or a child’s room we burnish it and put a matt soap finish over the top, which adds $9 a square metre.

Do you work outside the valley?

Forty miles from the workshop at no extra cost. Beyond that we quote accommodation for the crew, because four hours of driving a day comes out of your wall time and we would rather say so before you sign anything.

How many of you are there, and who actually turns up?

Four. Verity, Wilfred, and two decorators who have been here nine years and four years. A kitchen gets two of us for nine days, a whole house gets three. Nothing is subcontracted, which is also why we are booked eight weeks out.

Book the colour consultation, $450.

Two hours in your house, at the hour the light matters. Verity replies with two possible dates, usually the same week. Nothing is charged until we have been and seen the rooms.

The workshop
14 Quillon Street, Cawley Bridge, the Orsett valley
When we are in
Workshop 8am to 5pm, Monday to Friday. Consultations run on Tuesdays and Thursdays.

We reply the same day, or the next one if we are up a ladder.