
1958 16 ft
- 23 weeks
- 812 hours
- 1,640 rivets
Towed in off a cattle ranch with daylight showing through the floor. The owner stood in the doorway on survey day and asked if it was worth saving. It was.

Rivetbuck does one kind of job: full frame-off restorations of riveted aluminium trailers, in a shop off Slag Yard Road in Cobbet Junction. One lift, one shell in the air at a time, since 2006.
A 60 year old trailer rots from the bottom up, under a floor you cannot see past. The only honest way to fix it is to take the house off the chassis, and that is the only job we quote.

We cut the floor bolts, brace the shell with steel and hoist it clear. Nothing on the frame stays hidden under a floor we did not lay.
Blasted to bare steel, rotten rail sections cut out, new channel and outriggers welded in, primed and painted before anything sits on it again.
Marine plywood sealed on all six faces, bolted through to the frame. The number one reason a trailer comes back to us is a floor someone skimped on.
Solid rivets, set with a gun on the outside and a bucking bar on the inside. That takes two people and it is the way these shells were built.
Job 412 is a 1959 26 ft tandem-axle trailer that spent 31 years in a hay barn. This is where it stands this week, with the real days, hours and parts behind each stage. Pick a stage to see it. Sample job, updated every Friday.
Working day 68 of about 131. Stage 7 of 9.
On the lift now
New 12V and 120V wiring in marine-grade cable, PEX water lines, a tested propane line, and new closed-cell insulation. The belly pan is going back on this week, two people and a bucking bar at a time.
Rivets bucked on this trailer, through stage 7
1,110
1,110 so far of about 3,422 for the whole job. Each one set with a gun on the outside and a bucking bar held on the inside.

Towed in off a cattle ranch with daylight showing through the floor. The owner stood in the doorway on survey day and asked if it was worth saving. It was.

Both axles seized, two spring hangers rusted clean off. New rails from the axles back, new torsion axles, and it now tows straighter than the owner’s newer trailer.

The rarest shell we have had in. Eleven original panels were too far gone, so we rolled new ones from matching alloy and kept the rivet pattern exactly.

A solid rivet is set by two people. The gun hammers the head from outside while someone inside the shell holds a steel bucking bar against the tail until it mushrooms flat. It is slow, loud and exactly how these shells were built. Pop rivets are quicker, and they are why so many restored trailers leak at the seams in year three.
Every blind rivet is marked on the panel map with the reason. An egged hole gets the next size up, never a blob of sealant.
Most 22 to 26 ft trailers land between $58,000 and $74,000 and take 5 to 7 months. The survey tells you which end of that yours sits at, before you commit to anything.
Abe Kowalczyk spent 18 years riveting and welding freight cars in the Cobbet Junction yards before he bought his first 1950s trailer and found out what was under the floor. He opened Rivetbuck in 2006 in the old brake shop on Slag Yard Road. Otis Rakowski welds every frame. Jolene Vukovich runs the rivet crew and draws every panel map.


Sample figures for this concept.
They sent a photo every Friday for six months. The week the shell went up on the chains I drove four hours just to stand under it.
Two other shops quoted me a floor. Abe put it on the lift, showed me the rear rails with a screwdriver through them, and quoted me a frame. He was right.
The panel map they drew on day one came back with the trailer. Every panel number, every patch, every rivet they could not buck and why.
A frame survey is $450 and it is credited to the job if you go ahead. Tow it to Slag Yard Road and we put it on the lift, or we drive to you anywhere within 200 miles. You get photos of the frame, a written report and a fixed quote within a week.
(555) 014-59599 Slag Yard Road, Cobbet Junction. Shop hours Monday to Friday, 7 to 4.